IOSG: Bitcoin Needs to Hit $250K for Mining to Catch Up with AI Rent Collection
- Core Viewpoint: Bitcoin mining companies are converting scarce grid interconnection points into AI data center assets. Under an AI lease, the same 1MW of power generates approximately 8x the annual net income of mining, and Bitcoin would need to rise to about $250,000 to break even; the transition decision has largely been made, but of the approximately 6.3GW of contracted capacity, only about 1GW is operational, with Texas permitting risk and intermediary credit risk becoming the sector's core variables.
- Key Elements:
- CoinShares valuation: Built and leased AI data centers are worth approximately $27 million per MW, while unleased miner energized capacity is worth less than $3 million; after deducting $8 million to $15 million in construction costs, the gap remains 4 to 6x.
- Revenue comparison: At current hashprice, 1MW of mining nets approximately $230,000 per year, while AI lease NOI is $1.85 million to $2.15 million, with contract terms of 15 to 20 years including rent escalators.
- Transition cost: Nearly everything behind the meter must be rebuilt, requiring $8 million to $15 million per MW, comparable to new construction; what miners are really selling is that tenants can skip two to four years of grid queue time.
- Tenant concentration: CoreWeave accounts for 24% of contracted capacity, with $41.6 billion in recourse debt and a B+ rating; its bonds were briefly priced as distressed debt in October; Galaxy's exposure to CoreWeave reaches 100%, yet it offers the industry's lowest build return of approximately 15%.
- Texas risk: The new governor has promised to pause data center approvals; Riot, Hut 8 Beacon Point, and Galaxy together have 2.4GW in Texas, accounting for 38% of total contracted capacity; the pause is expected to last at least until mid-2027.
- Bitcoin sell pressure: Riot sold 20,264 BTC in the first nine months, leaving only 2,418; MARA sold 13,597 BTC to repay loans; the three remaining committed miners' holdings dropped from 60,500 BTC to approximately 36,000 BTC; remaining sell pressure mainly comes from MARA's approximately 20,400 BTC.
- Stock decoupling: After the election, Riot rose 25% on its already-approved Texas leases while Bitcoin fell 12% over the same period; Galaxy, Cipher, and CleanSpark fell 15% to 18% due to pending approval projects; mining company stocks have shifted to trading on AI credit and state-level permitting.
Original author: Mario Chow
Original source: IOSG Ventures
Stock prices are closing prices as of November 13, 2026; the Bitcoin price is $64,400 as of November 16. In this article, MW refers to critical IT load, i.e., the power actually delivered to servers. Gross MW refers to the power consumption of the entire campus, including cooling, typically 20% to 40% higher than IT load.
TL;DR
Why the pivot. CoinShares values built and leased AI data centers at roughly $27 million per MW, and values miners' energized capacity without tenants at less than $3 million. This 9x gap is not entirely the price of grid interconnection, because the former includes $8 million to $15 million per MW of construction input; after deducting construction costs, the gap is still 4 to 6 times. Calculated on operating profit per MW, mining at the current hashprice nets about $230,000 per year, while an AI lease yields about $1.9 million; Bitcoin would need to rise to about $250,000 to close this gap. Behind this is AI's power shortage: in the hottest US markets, connecting a new grid feed takes three to four years, while miners already hold energized interconnections. The November 3 midterm elections made these interconnections scarcer, because Texas elected a governor who pledged to pause approvals of data centers.
How the pivot works. Grid interconnections, substations, land, and permits can be reused; almost everything else is torn down and rebuilt at $8 million to $15 million per MW, roughly the same as building new. What miners sell is not the building, but the two to four years of queuing time that tenants can skip.
Who is pivoting. Eight listed mining companies have signed about 6.3 GW of IT capacity; on the morning after the election, Riot leased out its entire 910 MW Corsicana campus; Cipher has another 700 MW of gross power. Only about 1 GW is actually live. CoreWeave alone accounts for 24%, and there is no guarantor behind the rent. Riot's AI lab tenant (reportedly Anthropic) now accounts for 18%, almost as large as CoreWeave.
Revenue and cost. After operating costs, leases that disclose NOI range from $1.85 million to $2.15 million per MW per year; Galaxy Helios Phase II's NOI is estimated from its margin at about $2.3 million, an exception. Annual cost returns on buildings range from 15% to 20%. Riot's Corsicana lease breaks this range at about 33%, because the data hall is built by the tenant itself on Riot's already-energized land. The difference in nominal rent mainly comes from lease structure, not compensation for credit risk.
Implications. The few committed to mining have sold about 40% of their Bitcoin; the remaining selling pressure is mainly MARA. Riot sold 20,264 coins this year, leaving only 2,418; MARA sold 13,597 after the quarter ended to repay a Bitcoin-backed loan. MARA, CleanSpark, and Riot now hold about 36,000 coins combined, versus 60,500 in August, of which MARA's roughly 20,400 are most likely to keep flowing into the market. Hashrate fell and then recovered; miners exiting did not weaken the network. Mining stocks are no longer a Bitcoin proxy. After the election they diverged by state: Riot rose 25% while Bitcoin fell 12% over the same period; several with projects still to be delivered in Texas and Georgia fell 15% to 18%.
IOSG View
- CoreWeave is rent without compensation for risk, and Texas is the second risk. Galaxy charges CoreWeave the highest rent in the industry, but has the lowest building return at about 15% per year; CleanSpark leases to Meta at about 16%, and Hut 8 leases to investment-grade tenants at 17% to 21%. The weaker the tenant's credit, the more the landlord should earn, but reality is the opposite. CoreWeave accounts for 100% of Galaxy's AI business, about 53% of Core Scientific's, and 28% of Applied Digital's; Hut 8, CleanSpark, Riot, and TeraWulf have no exposure to it. CoreWeave's November 10 earnings beat expectations, and its stock jumped 25% the next day, but recourse debt increased by about $10 billion during the quarter to $41.6 billion, and by November 13 the stock was back at $53.
- The election added a second test. Companies with approved, leased, and financed MW rose; companies still waiting for Texas or Georgia approvals fell. Galaxy failed both: its business is all CoreWeave, and the Helios campus is in Texas, with Helios II not yet leased. Until CoreWeave's credit stabilizes and the Texas pause has a clear end date, landlords with high exposure should trade at a discount to those with low exposure. Core Scientific is the cleanest sample of CoreWeave exposure; its stock held steady after the election because 485 MW of the 590 MW it provides to CoreWeave is already collecting rent.
- Putting the two tests together, landlords fall into three groups. Group one is leased, not in Texas or Georgia, and fully financed: TeraWulf (New York and Kentucky, with Google guaranteeing the project financing for its Anthropic lease), Hut 8's River Bend (Louisiana, non-recourse bonds), and Applied Digital (North Dakota, secured notes). Group two is leased but in Texas or Georgia, with later phases still dependent on state permits or loans not yet in place: Riot's Rockdale and Corsicana, Hut 8's Beacon Point, Galaxy's Helios Phase I, and CleanSpark's Sandersville. Group three is not yet leased or not yet approved: Galaxy's Helios Phase II, MARA's Matagorda campus, and Cipher's reserve projects in Texas. Group one should have the smallest discount and group three the largest; Galaxy falls into both groups two and three, and also carries CoreWeave exposure on top.
- The main sellers of coins among miners were, as expected, the few committed to mining; the remainder is mainly MARA. In August, the converted landlords held almost no Bitcoin, while MARA, CleanSpark, and Riot held about 60,500 coins combined, all three with AI projects to fund. Since then, two of the three have sold. Riot sold 20,264 coins in the first nine months, about $1.5 billion, mainly for data center construction, leaving only 2,418 at the end of September. MARA sold 13,597 coins after the quarter ended at an average price of about $81,000, repaid a $750 million Bitcoin-backed loan, and said it would continue to use Bitcoin to raise money for its AI business. The three now hold about 36,000 coins combined (about $2.3 billion), meaning about 40% has been sold and 60% remains. Whether the rest is sold depends on who still needs money. Riot's 2,418 coins are already immaterial; the money it needs to spend at Corsicana will be covered by cash and project loans. CleanSpark's 13,530 coins are untouched; the Sandersville project is funded by secured notes, making it the least in need of selling coins—though it stopped issuing monthly production reports starting in October. MARA's roughly 20,400 coins ($1.3 billion) are the selling pressure to watch: it says it will keep selling, it may have to pay up to $600 million if its Texas campus gets power approval, and it is negotiating two leases that would require it to build itself. Inventory selling has passed its peak, but it is not over.
- Mining stocks are now an AI credit trade, with an added layer of Texas permitting after the election. Converted landlords track CoreWeave and Nebius, not Bitcoin: when Bitcoin rose in October, they fell along with CoreWeave's bonds. From November 3 to 13, Bitcoin fell 12%, while Riot rose 25% on a 910 MW Texas lease with power already approved; Galaxy, Cipher, and CleanSpark, which still have projects to deliver in Texas and Georgia, fell 15% to 18%. Buying this basket of stocks is a bet on AI data center financing and state-level permits, with only a small Bitcoin component left.
Why Miners Are Pivoting Away
The Price Rose, but Mining Got Worse
Hashprice is the expected revenue per PH/s of hashrate per day (before costs); it determines whether a miner can survive, and this number has been falling steadily.
Before the 2024 halving, 1 PH/s could earn about $105 per day. Now it earns about $30, while the Bitcoin price has returned to its level at that time. The halving cut the block subsidy in half, yet network-wide hashrate still rose about 70%, compressing each machine's share twice over. This is already close to this summer's low: hashprice briefly fell below $30, and CoinShares estimated the average cash cost for listed miners at $75,500 per coin while the coin price was only around $60,000, meaning the entire industry was mining at a loss.
Bitcoin rose to $84,000 in October and fell back to $64,400 this month. Neither move changed anything, because the returns on the other path are too far apart.
The Same 1 MW, Two Calculations
The chart below uses a hashprice of about $35 in late October; at the current $30, the mining column would be even lower.
Calculated on operating profit per MW, 1 MW of new-generation mining machines nets about $230,000 a year after electricity costs at the current hashprice, and the next generation of machines must be bought separately. Leased to an AI tenant, the same 1 MW can generate $1.85 million to $2.15 million of NOI (net operating income) over a 15- to 20-year contract, with annual rent escalators. Even if Bitcoin rises to $150,000 with difficulty unchanged, mining would yield only about $1 million a year, with no contractual guarantee.
This comparison has one point in favor of the leases: $1.9 million of NOI requires $8 million to $15 million per MW of construction input, while mining requires only about $800,000 per MW of mining machines. CoinShares' valuation also cannot be used directly to draw conclusions. It values built, fully leased AI data centers at about $27 million per MW, and values miners' energized capacity without tenants at less than $3 million, comparing two types of assets rather than the value of the same campus before and after leasing. After deducting construction costs from the leased valuation, $12 million to $19 million per MW remains, still 4 to 6 times the no-tenant valuation, but this does not account for construction completion risk and the two years before rent starts. The direction is clear, but the specific multiples are not precise.
The most persuasive evidence is how much miners are willing to pay to exit. Core Scientific spent about $42 million to cancel an order for 15 EH/s of new mining machines. Keel (formerly Bitfarms) stopped mining in June. Galaxy converted the entire Helios mining site and took an impairment charge.
How a Mining Site Becomes a Data Center
Keep the Socket, Rebuild the Rest
After conversion, only what is on the grid side, outside the meter, can remain.
Everything outside the meter can be reused; almost everything inside becomes obsolete. ASIC miners are useless for AI, and the buildings usually must be demolished. Miners actively curtail load when electricity prices rise, so they never installed backup generation or redundant power distribution, and cannot provide the uptime commitments AI tenants require. A single NVIDIA GB300 rack draws 130 to 140 kW, while an ordinary server rack draws only about 9 kW, and the heat must be carried away by liquid cooling tubes attached to the chips.
So the conversion cost is $8 million to $15 million per MW: TeraWulf guides $8 million to $10 million, Hut 8 $9 million to $11 million, CleanSpark about $11.9 million, and Galaxy's Helios Phase II about $15.4 million, essentially equal to building new. What is saved was never money—it is time.
Three Ways to Sell MW
Landlords can lease out an empty shell, lease out compute, or sell the campus outright.
Most of the industry sells a "powered shell": land, power, building, and cooling, with the tenant bringing its own GPUs, networking, and operations staff. This division of labor is what allows converted miners to be valued as real estate companies. Riot's Corsicana lease goes further, selling "powered land": Riot delivers only land, power, and rack platforms, while the tenant builds and operates the data hall itself.
IREN takes the compute-leasing path, most notably a five-year, $9.7 billion contract with Microsoft, for which it needs to purchase $5.8 billion of Dell hardware. Its revenue per MW is about five times that of a lease, but most of the chips' value is gone within five years, and the contract term is only one-third of a lease. Comparing IREN with landlords on revenue per MW is the most common mistake in this industry.
The third path is selling the campus. TeraWulf sold its equity in the Abernathy joint venture to Fluidstack for about $530 million, of which $250 million was received in Q3. CoreWeave tried to acquire Core Scientific outright in 2025, but Core Scientific's shareholders voted it down.
Where the Money Comes From
A 200 MW campus at $10 million per MW requires $2 billion, and construction spending comes about two years before rent starts.
The timing risk to watch most closely remains Riot. Its $573 million Morgan Stanley bridge loan matures on December 31, 2026, but the first 96 MW at Rockdale will not start rent until December 2027, and the investment-grade guarantee for this $9.1 billion lease is still being finalized. Riot had $950 million in cash and Bitcoin at the end of September, says it does not plan to issue equity, and is arranging project loans for Rockdale and Corsicana. Before